济南环氧地坪漆施工三个标准

浏览量:   来源:www.bifaqd.com  作者:科旭地坪
济南环氧地坪漆施工3个工艺流程介绍
Introduction to Three Technological Processes of Jinan Floor Paint Construction
1、基础地面处理:(水泥基础、水磨石基础、金刚砂基础)
1. Ground treatment of foundation: (cement foundation, terrazzo foundation, diamond foundation)
首先测试基础表面的强度(在达C-25)和表面平整度(2-3mm/2M以内),再测试表面的含水率(8%以下)和室内环境的湿度(85%)及温度(10-35度).然后看基础表面是否有开裂,是否被油污污染的情况.以上项目测试的数据存档告知甲方,基础地面做出来的工程质量会是怎样?如果遇到基础地面质量差的,必需提出改善方案与甲方商议.水泥基础处理质量是工程的保障.处理后的要求:表面强度达到地坪漆施工标准,表面无开裂和油污,清理干净后可涂装环氧底涂层.
Firstly, the strength (up to C-25) and surface smoothness (less than 2-3mm/2M) of the base surface are tested, then the moisture content (below 8%) of the surface and the humidity (85%) and temperature (10-35 degrees) of the indoor environment are tested. Then, whether the base surface is cracked or contaminated by oil pollution is observed. The data of the above items are archived to inform Party A that the base surface is made. What will be the quality of the project? If the quality of the foundation ground is poor, it is necessary to put forward improvement plan and discuss with Party A. The quality of cement foundation treatment is the guarantee of the project. After treatment, the surface strength meets the construction standard of floor paint, and there is no crack and oil stain on the surface. After cleaning, the epoxy primer coating can be applied.
2、环氧底漆施工:材料配比时按标准比例调配,按顺时针和逆时针两个方向把材料充分搅拌均匀后,静放3分钟消泡后再施工,采用滚涂方法在处理好的基础地面滚涂一至两道底漆材料,每道间隔8小时,完成实干后再涂第二道.环氧底涂层主要是衔接作用,把基础地面和环氧涂层粘合在一起,避免脱层.
2. Construction of epoxy primer: Material proportioning should be adjusted according to the standard proportion. Material should be fully stirred in clockwise and counterclockwise directions. After defoaming for 3 minutes, the primer material should be rolled one or two times on the treated base floor by rolling coating method, with an interval of 8 hours, and then the second way of epoxy primer should be coated after drying. Layer is mainly a cohesive function, the foundation floor and epoxy coating are bonded together to avoid delamination.
3、环氧砂浆中涂施工:把环氧中涂AB组份的材料按比例搅拌均匀后,加入1:0.5的石英砂搅拌均匀后,静放3分钟消泡后再施工,施工可采用刮涂和镘涂法,彩田化工提示您在施工时要注意力度的匀衡,避免涂层厚薄不均匀,固化的时候和速度不同,有的区域涂层没有实干就施工,表面会出现起泡和脱层质量问题.
3. Epoxy mortar coating construction: after mixing the material of AB component in epoxy evenly in proportion, adding 1:0.5 quartz sand to mix evenly, and then defoaming for 3 minutes, the construction can be carried out by scraping and dysprosium coating method. Colorful field chemical industry prompts you to pay attention to the uneven construction, avoid uneven thickness of coating, curing time and speed. Different degrees, some areas of coating construction without solid, surface foaming and delamination quality problems will occur.